Main Contractors

We work with Main Contracts in the building industry to deliver the flood defence element of their overriding construction project.

The most streamlined projects are executed as a direct result of our early involvement during both pre-tender qualification stage and tender stage with a Main Contractor.

We are recognised for offering high quality consultation and bespoke flood defence design services throughout the tender process.

Crucially, our consultation during tender stage allows for any bespoke construction elements of the required flood defences to be raised prior to works commencing. Whether a project is being tendered or solely being designed, we can provide the expertise and product solutions relevant to the project.

This holistic view upfront is imperative to ensure seamless integration of our flood defences to site, as well as the most cost-effective and efficient delivery.

Related Case Studies

  • THE HOME OFFICE, UK Border Agency

    Requirements

    Lakeside Demountable Aluminium Flood Barriers;
    Lakeside Slimline Demountable Aluminium Flood Barriers
    Flood Barrier Accessories

    Overview

    The barriers have been utilised in the last flood.
    On the 20th February 2022 the water reached 450mm above finished floor level and the building remained dry and operational

    Installation date

    February 2022.

  • Ace, Sandbanks, Poole

    Requirements

    Lakeside Demountable Aluminium Flood Barrier System, 900mm – 1500mm H.

    Bespoke project features

    Vertical wall-mounted storage units, Concealment of side
    posts within cladding, Joint inter-company working with both Architect and Main Contractor

    Installation date

    December 2016.

  • Fremlin Walk, Maidstone Kent

    Requirements

    Lakeside Demountable Aluminium Flood Barrier System, 900mm – 1200mm H.

    Bespoke project features

    Bespoke steel ramps to car park openings, required
    due to high frequency of vehicle traffic, Demountable system allowing adjustable height, Lockable top pressing clamps, ensuring barriers can be locked into place once system is deployed and more…

    Installation date

    January 2017.

  • Kier

    Requirements

    2 Lakeside Demountable aluminium Flood Barriers, 2400mm H.

    Bespoke project features

    Project meeting attendance; product demonstration and bespoke ground works.

    Installation date

    July 2015.

     

  • Luxury Marina Development, Ocean Village, Southampton

    Requirements

    9 Lakeside Demountable Aluminium Flood Barriers, 300 – 900mm H.

    Bespoke project features

    Bespoke cover plates; storage racks with accompanying Installation Reminder Sign.

    Installation date

    August 2017.

     

  • McCarthy & Stone

    Retirement Living Development, Harbour Road, Gosport, Hampshire UK

    Requirements

    2 Lakeside Demountable Aluminium Flood Barriers, 1800mm H.

    Bespoke project features

    CAD drawings; project meeting attendance from design phase; product samples and technical advice.

    Installation date

    September 2017.

     

  • PWP Architects/Soho House

    PWP Architects/Soho House, Confidential Client UK

    Requirements

    Various 1.5m H and 900mm H barriers.

    Supporting Information Provided

    Initial site meeting and survey, product demonstration, bespoke ground works, bespoke pressing clamps and bespoke lockable cover plates for side posts.

    Installation date

    January 2016.

     


View all Case Studies